Description
Ultra thermal fabric for warmth without weight.Can be used as a hat or neck cowl, elasticated drawcord with toggle, unique dual purpose design.
Ultra thermal fabric for warmth without weight.Can be used as a hat or neck cowl, elasticated drawcord with toggle, unique dual purpose design.
| Colour | French Navy |
|---|---|
| Size | One size |
Reviews
There are no reviews yet.