PRODUCTS

YDP – Beechfield Suprafleece SnoodHat Combo

£18.00

Ultra thermal fabric for warmth without weight.Can be used as a hat or neck cowl, elasticated drawcord with toggle, unique dual purpose design.

SKU N/A Category

Description

Ultra thermal fabric for warmth without weight.Can be used as a hat or neck cowl, elasticated drawcord with toggle, unique dual purpose design.

Additional information

Colour

French Navy

Size

One size

Reviews

There are no reviews yet.

Be the first to review “YDP – Beechfield Suprafleece SnoodHat Combo”

Your email address will not be published. Required fields are marked *