PRODUCTS

YDP – NEW ERA 9FORTY CAP – Navy

£23.00

A classic structured cap with an authentic look. With a precurved visor, the 9FORTY is casual and stylish. A low contoured crown gives each cap a close snug fit, structured panels and adjustable strapback fastening ensure a finished look that sits comfortably.

SKU N/A Category

Description

A classic structured cap with an authentic look. With a precurved visor, the 9FORTY is casual and stylish. A low contoured crown gives each cap a close snug fit, structured panels and adjustable strapback fastening ensure a finished look that sits comfortably.

Additional information

Colour

Navy

Size

One size

Reviews

There are no reviews yet.

Be the first to review “YDP – NEW ERA 9FORTY CAP – Navy”

Your email address will not be published. Required fields are marked *